fbpx

Contractors Portal

(818) 510-1845

GET STARTED

0$

Thank you, we will contact you soon !

Currently have an HVAC?

Follow the Steps for Accurate Pricing:



I have a:
You need to select an item to continue

Change out HVAC installation

What size is your HVAC system?


  • 1. Efficient demolition and responsible removal of existing equipment.

    2. Installation of a high-capacity ___ ton condenser unit with precision and expertise.

    3. Installation of a reliable ___ ton 80% efficiency furnace to ensure consistent performance.

    4. Integration of a state-of-the-art ___ ton R410 coil for optimal cooling efficiency.

    5. Expert reconnection of refrigeration lines to maintain seamless operation.

    6. Professional reconnection and installation of drain line to prevent potential leaks.

    7. Precision installation of a digital thermostat for precise temperature control and energy savings.

    8. Safe and compliant reconnection of 220V power supply to the condenser unit.

    9. Meticulous reconnection of 110V power supply to the furnace for optimal voltage and performance.

    10. Safe and secure reconnection of gas supply to the furnace, prioritizing safety protocols.

    11. Installation of a durable gas flex line to facilitate efficient gas flow to the furnace.

    12. Conducting a comprehensive Hers test to evaluate and optimize airflow for maximum efficiency.

    13. Thorough check-up and operational testing to verify proper functioning of all components.

    14. Coordination of final inspection by city authorities to ensure compliance with regulations.


    By implementing these steps, your HVAC change out will be executed seamlessly, ensuring reliability, efficiency, and safety for your peace of mind.


1. Efficient removal and disposal of old units to make space for the new ones.

2. Run all new electrical wiring for the units, ensuring correct 220-volt connections for maximum output and efficiency.

3. Connect the new units to the existing line set, ensuring proper sizing and compatibility.

4. Conduct a thorough pressure check on the line set using nitrogen at 150 psi to detect any leaks or weaknesses.

5. Run a vacuum pump on the units to remove any air and moisture, ensuring optimal performance.

6. Release Freon into the new units in a controlled manner, following industry standards and regulations.

7. Properly connect and seal the air handler to the existing plenum, ensuring a tight seal all around to prevent air leaks.

8. Install a new PVC drain line with a P-trap, safety switch, and drain pan to ensure efficient drainage and prevent water damage.

9. Construct a sturdy platform for the heat pump condenser on the roof, ensuring stability and safety.

10. Install a new disconnect box with fuses and an electrical whip for safe and compliant electrical connections.

11. Install a new thermostat for precise temperature control and user convenience.

12. Perform a comprehensive system check and run to verify proper operation and performance.

13. Offer a 10-year warranty on the units to guarantee quality and reliability.

14. Provide a 1-year warranty on labor to ensure customer satisfaction and peace of mind.


By following this plan, the HVAC installation will be executed with precision, efficiency, and attention to detail, ensuring optimal performance and longevity of the system.


  • Careful installation of the package unit, ensuring precise positioning and alignment.
  • Expert reconnection of refrigeration lines to ensure seamless operation and optimal performance.
  • Professional installation of the drain line to prevent leaks and maintain system efficiency.
  • Installation of a top-quality digital thermostat for accurate temperature control and energy savings.
  • Secure reconnection of the 220V power supply to the package unit, following safety standards and electrical codes.
  • Proper reconnection of the 110V power supply to the unit, guaranteeing optimal voltage for efficient operation.
  • Safe reconnection of gas supply to the unit, with strict adherence to safety protocols and regulations.
  • Installation of a gas flex line to ensure safe and efficient gas flow to the package unit.
  • Thorough evaluation of airflow through a comprehensive system check to maximize efficiency.
  • Detailed operational testing to confirm the proper functioning of all package unit components.
  • Coordination of the final inspection by local authorities to ensure compliance with regulations and standards.
You need to select an item to continue

What size is your Home?

You need to select an item to continue

What size is your Home?

You need to select an item to continue

How many Ducting & Venting do you need to change/add?

Ducts are pathways that transport heated or cooled air from HVAC systems within the house.



You need to select an item to continue

How many ducts do you need?

Ducts are pathways that transport heated or cooled air from HVAC systems within the house.

You need to select an item to continue

How many rooms do you have?

Including: living room, bathrooms, bedrooms, kitchen...

You need to select an item to continue

Type Of HVAC

Chose the HVAC that you’re looking for

The Goodman HVAC system boasts a standard SEER rating of 14.3. This unit is backed by a 10-year warranty on parts, providing peace of mind for long-term reliability. Additionally, it includes a 1-year warranty on labor, ensuring comprehensive coverage for the initial period of use.

Introducing the Star Air HVAC Inverter boasting a SEER 18 rating. Benefit from a 10-year parts warranty and 2-year labor coverage. Enjoy unparalleled energy efficiency and whisper-quiet operation.

Introducing the Star Air HVAC Inverter Slim, featuring a SEER 17 rating for exceptional energy efficiency. Backed by a 10-year warranty on parts and 2-year warranty on labor. Enjoy whisper-quiet operation and long-term reliability.

You need to select an item to continue

Welcome to the customers portal.

Follow the Steps for Accurate Pricing:

You need to select an item to continue

New cut HVAC installation

What size HVAC system do you need?


  • 1. Demolition and removal of existing equipment.

    2. Installation of new condenser.

    3. Installation of furnace at 80% efficiency.

    4. Installation of R410 coil.

    5. Reconnection of refrigeration lines with precision.

    6. Installation/reconnection of drain line.

    7. Setup and configuration of digital thermostat.

    8. Reconnection of 220V power supply to the condenser unit.

    9. Reconnection of 110V power supply to the furnace.

    10. Reconnection of gas supply to the furnace.

    11. Installation of gas flex line.

    12. Conduct Hers test to ensure optimal airflow.

    13. Thorough inspection and operational testing.

    14. Final inspection by city authorities for compliance.

    15. Installation of R6 ducts for improved efficiency.

    16. Proper hanging and strapping of ducts according to city code.

    17. Installation of condenser pad for stability and vibration control.

    18. Installation of sediment trap for condensate drainage.

    19. Installation of P-trap as per city code for drainage.

    20. Installation of safety switch for added protection.

    21. Sealing of all mechanical connections with durable hard cast tape to prevent air leaks.

    22. Installation of safety caps for condenser as mandated by city regulations.


    By ensuring each step is executed meticulously, the entire HVAC system installation will be done with precision and in compliance with all relevant codes and regulations, resulting in optimal performance and safety.


  1. Demolition and removal of existing equipment.
  2. Complete installation of all new electrical wiring for the unit in compliance with electrical codes.
  3. Install all new line sets for the unit to ensure optimal performance.
  4. Add new supply and return plenums and thoroughly seal them to the unit to prevent any air leaks.
  5. Connect line sets to units and conduct a pressure test with nitrogen at 150 psi for safety and integrity.
  6. Operate a vacuum pump in the line sets to remove any air or moisture.
  7. Introduce Freon into the units in a controlled manner.
  8. Install all new PVC drain lines with P-trap and safety switch to ensure maximum drainage efficiency.
  9. Run all new R6 flex ducts from each distribution box to the plenum for improved airflow and efficiency.
  10. Seal off all ducts at both ends and add insulation to prevent any air leaks and enhance energy efficiency.
  11. Provide all necessary T's and star collars as needed and hang ductwork to maximize airflow.
  12. Install a new catwalk for easy access to the unit, including a light switch for safety and convenience.
  13. Add a new attic access point for future maintenance needs. (As needed)
  14. Install a new line set cover for outdoor exposed lines to protect them from the elements.
  15. Lay down a new condenser pad for stability and vibration control.
  16. Install a new disconnect box with fuses and electrical whip for safety and compliance.
  17. Install a new thermostat for precise temperature control.
  18. Perform a comprehensive system check and run to ensure everything operates smoothly.
  19. Offer a 10-year warranty on units and a 1-year warranty on labor for customer peace of mind.


This comprehensive plan ensures that the HVAC system is installed with precision, efficiency, and durability, meeting all standards and providing long-term satisfaction for the customer.


  • Careful installation of the package unit, ensuring precise positioning and alignment.
  • Expert reconnection of refrigeration lines to ensure seamless operation and optimal performance.
  • Professional installation of the drain line to prevent leaks and maintain system efficiency.
  • Installation of a top-quality digital thermostat for accurate temperature control and energy savings.
  • Secure reconnection of the 220V power supply to the package unit, following safety standards and electrical codes.
  • Proper reconnection of the 110V power supply to the unit, guaranteeing optimal voltage for efficient operation.
  • Safe reconnection of gas supply to the unit, with strict adherence to safety protocols and regulations.
  • Installation of a gas flex line to ensure safe and efficient gas flow to the package unit.
  • Thorough evaluation of airflow through a comprehensive system check to maximize efficiency.
  • Detailed operational testing to confirm the proper functioning of all package unit components.
  • Coordination of the final inspection by local authorities to ensure compliance with regulations and standards.
You need to select an item to continue

Final cost

The final estimated price is :

Summary

Description Information Quantity Price
Discount :
Total :

Signature

GET STARTED

0$

Thank you, we will contact you soon !

Currently have an HVAC?

Follow the Steps for Accurate Pricing:



I have a:
You need to select an item to continue

Change out HVAC installation

What size is your HVAC system?


  • 1. Efficient demolition and responsible removal of existing equipment.

    2. Installation of a high-capacity ___ ton condenser unit with precision and expertise.

    3. Installation of a reliable ___ ton 80% efficiency furnace to ensure consistent performance.

    4. Integration of a state-of-the-art ___ ton R410 coil for optimal cooling efficiency.

    5. Expert reconnection of refrigeration lines to maintain seamless operation.

    6. Professional reconnection and installation of drain line to prevent potential leaks.

    7. Precision installation of a digital thermostat for precise temperature control and energy savings.

    8. Safe and compliant reconnection of 220V power supply to the condenser unit.

    9. Meticulous reconnection of 110V power supply to the furnace for optimal voltage and performance.

    10. Safe and secure reconnection of gas supply to the furnace, prioritizing safety protocols.

    11. Installation of a durable gas flex line to facilitate efficient gas flow to the furnace.

    12. Conducting a comprehensive Hers test to evaluate and optimize airflow for maximum efficiency.

    13. Thorough check-up and operational testing to verify proper functioning of all components.

    14. Coordination of final inspection by city authorities to ensure compliance with regulations.


    By implementing these steps, your HVAC change out will be executed seamlessly, ensuring reliability, efficiency, and safety for your peace of mind.


1. Efficient removal and disposal of old units to make space for the new ones.

2. Run all new electrical wiring for the units, ensuring correct 220-volt connections for maximum output and efficiency.

3. Connect the new units to the existing line set, ensuring proper sizing and compatibility.

4. Conduct a thorough pressure check on the line set using nitrogen at 150 psi to detect any leaks or weaknesses.

5. Run a vacuum pump on the units to remove any air and moisture, ensuring optimal performance.

6. Release Freon into the new units in a controlled manner, following industry standards and regulations.

7. Properly connect and seal the air handler to the existing plenum, ensuring a tight seal all around to prevent air leaks.

8. Install a new PVC drain line with a P-trap, safety switch, and drain pan to ensure efficient drainage and prevent water damage.

9. Construct a sturdy platform for the heat pump condenser on the roof, ensuring stability and safety.

10. Install a new disconnect box with fuses and an electrical whip for safe and compliant electrical connections.

11. Install a new thermostat for precise temperature control and user convenience.

12. Perform a comprehensive system check and run to verify proper operation and performance.

13. Offer a 10-year warranty on the units to guarantee quality and reliability.

14. Provide a 1-year warranty on labor to ensure customer satisfaction and peace of mind.


By following this plan, the HVAC installation will be executed with precision, efficiency, and attention to detail, ensuring optimal performance and longevity of the system.


  • Careful installation of the package unit, ensuring precise positioning and alignment.
  • Expert reconnection of refrigeration lines to ensure seamless operation and optimal performance.
  • Professional installation of the drain line to prevent leaks and maintain system efficiency.
  • Installation of a top-quality digital thermostat for accurate temperature control and energy savings.
  • Secure reconnection of the 220V power supply to the package unit, following safety standards and electrical codes.
  • Proper reconnection of the 110V power supply to the unit, guaranteeing optimal voltage for efficient operation.
  • Safe reconnection of gas supply to the unit, with strict adherence to safety protocols and regulations.
  • Installation of a gas flex line to ensure safe and efficient gas flow to the package unit.
  • Thorough evaluation of airflow through a comprehensive system check to maximize efficiency.
  • Detailed operational testing to confirm the proper functioning of all package unit components.
  • Coordination of the final inspection by local authorities to ensure compliance with regulations and standards.
You need to select an item to continue

What size is your Home?

You need to select an item to continue

What size is your Home?

You need to select an item to continue

How many Ducting & Venting do you need to change/add?

Ducts are pathways that transport heated or cooled air from HVAC systems within the house.



You need to select an item to continue

How many ducts do you need?

Ducts are pathways that transport heated or cooled air from HVAC systems within the house.

You need to select an item to continue

How many rooms do you have?

Including: living room, bathrooms, bedrooms, kitchen...

You need to select an item to continue

Type Of HVAC

Chose the HVAC that you’re looking for

The Goodman HVAC system boasts a standard SEER rating of 14.3. This unit is backed by a 10-year warranty on parts, providing peace of mind for long-term reliability. Additionally, it includes a 1-year warranty on labor, ensuring comprehensive coverage for the initial period of use.

Introducing the Star Air HVAC Inverter boasting a SEER 18 rating. Benefit from a 10-year parts warranty and 2-year labor coverage. Enjoy unparalleled energy efficiency and whisper-quiet operation.

Introducing the Star Air HVAC Inverter Slim, featuring a SEER 17 rating for exceptional energy efficiency. Backed by a 10-year warranty on parts and 2-year warranty on labor. Enjoy whisper-quiet operation and long-term reliability.

You need to select an item to continue

Welcome to our smart estimator

Follow the Steps for Accurate Pricing:

You need to select an item to continue

New cut HVAC installation

What size HVAC system do you need?


  • 1. Demolition and removal of existing equipment.

    2. Installation of new condenser.

    3. Installation of furnace at 80% efficiency.

    4. Installation of R410 coil.

    5. Reconnection of refrigeration lines with precision.

    6. Installation/reconnection of drain line.

    7. Setup and configuration of digital thermostat.

    8. Reconnection of 220V power supply to the condenser unit.

    9. Reconnection of 110V power supply to the furnace.

    10. Reconnection of gas supply to the furnace.

    11. Installation of gas flex line.

    12. Conduct Hers test to ensure optimal airflow.

    13. Thorough inspection and operational testing.

    14. Final inspection by city authorities for compliance.

    15. Installation of R6 ducts for improved efficiency.

    16. Proper hanging and strapping of ducts according to city code.

    17. Installation of condenser pad for stability and vibration control.

    18. Installation of sediment trap for condensate drainage.

    19. Installation of P-trap as per city code for drainage.

    20. Installation of safety switch for added protection.

    21. Sealing of all mechanical connections with durable hard cast tape to prevent air leaks.

    22. Installation of safety caps for condenser as mandated by city regulations.


    By ensuring each step is executed meticulously, the entire HVAC system installation will be done with precision and in compliance with all relevant codes and regulations, resulting in optimal performance and safety.


  1. Demolition and removal of existing equipment.
  2. Complete installation of all new electrical wiring for the unit in compliance with electrical codes.
  3. Install all new line sets for the unit to ensure optimal performance.
  4. Add new supply and return plenums and thoroughly seal them to the unit to prevent any air leaks.
  5. Connect line sets to units and conduct a pressure test with nitrogen at 150 psi for safety and integrity.
  6. Operate a vacuum pump in the line sets to remove any air or moisture.
  7. Introduce Freon into the units in a controlled manner.
  8. Install all new PVC drain lines with P-trap and safety switch to ensure maximum drainage efficiency.
  9. Run all new R6 flex ducts from each distribution box to the plenum for improved airflow and efficiency.
  10. Seal off all ducts at both ends and add insulation to prevent any air leaks and enhance energy efficiency.
  11. Provide all necessary T's and star collars as needed and hang ductwork to maximize airflow.
  12. Install a new catwalk for easy access to the unit, including a light switch for safety and convenience.
  13. Add a new attic access point for future maintenance needs. (As needed)
  14. Install a new line set cover for outdoor exposed lines to protect them from the elements.
  15. Lay down a new condenser pad for stability and vibration control.
  16. Install a new disconnect box with fuses and electrical whip for safety and compliance.
  17. Install a new thermostat for precise temperature control.
  18. Perform a comprehensive system check and run to ensure everything operates smoothly.
  19. Offer a 10-year warranty on units and a 1-year warranty on labor for customer peace of mind.


This comprehensive plan ensures that the HVAC system is installed with precision, efficiency, and durability, meeting all standards and providing long-term satisfaction for the customer.


  • Careful installation of the package unit, ensuring precise positioning and alignment.
  • Expert reconnection of refrigeration lines to ensure seamless operation and optimal performance.
  • Professional installation of the drain line to prevent leaks and maintain system efficiency.
  • Installation of a top-quality digital thermostat for accurate temperature control and energy savings.
  • Secure reconnection of the 220V power supply to the package unit, following safety standards and electrical codes.
  • Proper reconnection of the 110V power supply to the unit, guaranteeing optimal voltage for efficient operation.
  • Safe reconnection of gas supply to the unit, with strict adherence to safety protocols and regulations.
  • Installation of a gas flex line to ensure safe and efficient gas flow to the package unit.
  • Thorough evaluation of airflow through a comprehensive system check to maximize efficiency.
  • Detailed operational testing to confirm the proper functioning of all package unit components.
  • Coordination of the final inspection by local authorities to ensure compliance with regulations and standards.
You need to select an item to continue

Final cost

The final estimated price is :

Summary

Description Information Quantity Price
Discount :
Total :
Scroll to Top
Scroll to Top